The Minerals & Metals (M&M) business vertical of L&T secured an order from Hindalco for setting up an 850 KTPA (kilo tonne per annum) greenfield alumina refinery plant in Odisha.…
MODEC has entered into a Front End Engineering and Design (FEED) contract with SAMSUNG E&A for an offshore carbon capture pilot project, selecting Carbon Clean’s modular CycloneCC technology. The study…
Rincon Mining recently named Worley as the Lead Integration Delivery Partner for its new lithium project in Argentina.
With a total investment of more than $2 billion USD by Rio Tinto,…
Saipem and Subsea7 has announced that they have reached an agreement in principle on the key terms of a possible merger of the two companies (the “Proposed Combination”) through the…
Wood Group PLC has been awarded a $120 million contract extension by Shell UK Limited to provide brownfield engineering, procurement and construction (EPC) to onshore and offshore assets across the…
The Minister of Petroleum and Mineral Resources of the Arab Republic of Egypt Karim Badawi, the Minister of Energy, Commerce and Industry of the Republic of Cyprus George Papanastasiou, the…
Wood has been awarded the front-end engineering design (FEED) scope for the Zeevonk hydrogen facility, in Rotterdam, Netherlands. The hydrogen plant will be powered by offshore wind and floating offshore solar…
SBM Offshore announced the signature of a study with PETROBRAS for the application of Carbon Capture Modules on FPSOs.
The module design is based on a successful engineering and design study…
SICIM has announced that it will develop the Pipeline Onshore FEED for the “Mozambique Rovuma LNG Phase 1” project.
The works have been commissioned by Subsea7 as part of ExxonMobil’s development…
AD Ports Group has signed a shareholders’ agreement with the CMA CGM Group, a global player in sea, land, air, and logistics solutions, through its subsidiary CMA Terminals, to jointly…
We’ve been selected by First Ammonia to deliver the front-end engineering design (FEED) for an electric ammonia facility in Victoria, Texas.
This facility has an initial anticipated production capacity of 300…
Aker Solutions and SLB Capturi have been awarded a contract for the carbon capture and storage solution at Hafslund Celsio’s waste-to-energy plant in Oslo, Norway. The contract will deliver a carbon…
