Aker Solutions has been awarded a sizeable EPCIC contract by Equinor to prepare the topside of Troll A for accelerating production from the Troll West gas reservoir.
The Troll field is situated in the North Sea, 80 km northwest of Bergen, and is Norway’s largest gas producer, supplying 10 percent of Europe’s total gas needs. Troll…
Aker Solutions is appointed to design the subsea substations for Med Wind, the Mediterranean's largest floating offshore wind farm.
Renexia, through its subsidiary Renext Solutions, has signed a front-end engineering and design contract (FEED) with Aker Solutions a leading company for underwater solutions in the energy industry, to design the underwater substations for Med Wind, the…