TARGET Engineering Awarded a sub-contract worth around SAR 145mn in Jubail-3A

Arabtec Holding PJSC, announced that its wholly-owned subsidiary, TARGET Engineering Construction Company, has been awarded a 14 months sub-contract worth SAR 145mn, from Shandong Tiejun Electric Power Engineering Company Ltd for the Construction of offshore Marine works in JUBAIL-3A Independent Water Project located at Jubail city in the Kingdom of Saudi Arabia.

Source: target.ae

saudi armaco

Saudi Aramco discovered two oil and gas fields in northern parts of Saudi Arabia

Saudi Aramco discovered two oil and gas fields in northern parts of Saudi Arabia, the kingdom’s official news agency reported, citing Energy Minister Prince Abdulaziz bin Salman.

Gas has started flowing from Hadabat Al-Hajara field near the Iraqi border at an average daily rate of 16 million standard cubic feet, in addition to 1,944 barrels of condensates, which are a type of petroleum that usually isn’t classified as crude oil because it’s too light. The nearby Abraq at-Tulul field has started producing 3,000 barrels a day of crude, 49 barrels of condensates and 1.1 million cubic feet of gas.

Aramco said it will drill more wells to evaluate how much energy the fields hold.

The crude finds pale in comparison to the state firm’s existing production of around 8.5 million barrels a day. But the gas discoveries could help its goal of boosting non-oil output, according to Robin Mills, founder of Dubai-based consulting firm Qamar Energy.

Source: Bloomberg

Acciona- petropipe

Saline Water Conversion Corporation (SWCC) awarded ACCIONA and its partner RTCC to build $500m desalination plant in Saudi Arabia

The Saudi publicly-owned company Saline Water Conversion Corporation (SWCC) has awarded ACCIONA and its partner RTCC the construction of the Al Khobar 2 desalination plant at Khobar, on the east coast of Saudi Arabia around 400 kilometres from Riyadh. It is a turnkey contract valued at around $500 million (€460 million).

It will be one of the largest in the country, with a capacity of 600,000 m³ per day to serve a population of three million

The facility will be equipped with reverse osmosis technology and a daily capacity of more than 600,000 m³, making it one of the biggest in the country and the largest RO plant under EPC scheme awarded in a single shot in KSA. It will provide a service to three million people in the area. ACCIONA thus consolidates its presence in the water treatment sector in Saudi Arabia, a country in which it currently has three projects under way.

Last year, a €750-million contract was awarded for the financing, design, construction, operation and maintenance (for 25 years) of the Shuqaiq3 desalination plant. Located in the south-west of the country on the Red Sea coast, it is expected to be completed sometime in 2021 and will have a  treatment capacity of 450,000 m³ per day to provide a service to a population equivalent of two million. It will also be equipped with a photovoltaic plant to reduce internal energy consumption.

In July 2018, a contract was also awarded for around €200 million to build and commission the Al Khobar 1 desalination plant (capacity: 210,000 m³/day). It is located close to the Al Khobar 2 plant and serves a population of 1,000,000.

The company has also designed and built the Al Jubail RO4 seawater desalination plant in the east of the country for the utility Marafiq. With a capacity of 100,000 m³ per day, it serves both the city and the nearby industrial complex.

Source: ACCIONA News